Preparing for
installation
Mount this screen only on suitable surfaces. Pay
attention to the product specifications and if
necessary, hire a qualified contractor to guaran-
tee the professional assembly of the screen. Prior
to first use, please remove the securing devices, if
present, from the casing of the screen.
Please keep the packaging in a good
1
condition, in case you wish to return the
screen.
Please be careful when
2
moving the unpacked
screen, especially when passing
through doors.
Select a suitable locati-
3
on for installation and
make that sure that the surface
is flat and clean.
Operation Type A
Unfold all three tripod legs and make
1
sure that the screen is standing securely
and firmly.
Press button A , and with the other
2
hand, pull the support bar vertically
upward.
If present, place the bracket around the
3
upper end of the support bar.
Next, rotate the screen box 90° so that
4
the screen can be extended upwards.
Pull the screen up and out...
5
... and fasten the screen bracket onto the
6
previously set up mounting bracket.
Now press button A again, and pull the
7
support bar carefully upwards.
Now press button B , and pull the
8
screen box as far down as you need for
the screen surface.
17