Step 1
Adjust the bathtub feet until the bathtub base is 3mm above the floor, then use
the wrench to tighten the nuts and level ruler to level the bathtub.
Step 3
Tilt the bath, connect the drain-pipe to the drain-hole on the floor,
Step 4
Position the bathtub on the floor marking
(step 2), make sure the flexible connector
is not kinked upward on installation as
this will result in drainage issue.
Water testing:
A) Water test your bath prior to enclosing to ensure it drains correctly as no claims for non-draining
baths will be valid after enclosing or tiling has been done;
B) Water test overflow pipe and waste to ensure they are not leaking.
INSTALLATION
Step 5
Apply silicone gel around the base surrounding of the
bathtub.
***Do not use the bath within 24 hours to let the silicone
fully cure.
4
Step 2
Mark the floor with
the outline of the
bathtub at the
installation position
with the marking
pencil.
ID: 135479
135481
135457
Overflow pipe