1
General information
1.1
Target group
These instructions are intended for specialists and/or instructed technical
personnel (e .g . engineers, architects, heads of construction and mounting
and installation engineers) charged with the planning and installation of the
GES9-3 plastic service unit .
1.2
Using these instructions
•
Before commencing work, read these mounting instructions through once
completely . In particular, please observe the safety instructions .
•
The manufacturer will not accept liability for damage caused through non-
observance of these mounting instructions .
•
Any images are intended merely as examples . Mounting results may look
different .
1.3
Correct use
The GES9-3 plastic service unit is suitable for the installation of electrical
devices close to workplaces in screed-covered duct systems, screed-flush
underfloor ducts and system floors . In accordance with the standard, the
GES9-3 plastic service units can only be used in dry rooms with dry-cleaned
floor coverings .
The system offers installation space for up to twelve Modul 45 devices in three
installation housings (e .g . type UT4) for electrical installations or various data
and multimedia connections .
The cord outlet integrated in the hinged lid allows the pass-through of connec-
tion cables, even in a closed state .
The system is not intended for other purposes, particularly not for access to
water, wastewater or gas pipelines or those of other liquids .
1.4
Basic standards
The GES9-3 plastic service unit was manufactured and tested according to
EN 50085-2-2 (see declaration of conformity http://obo .eu/dcges9-3) .
GES9-3 plastic service unit
General information
EN | 17