Final Check - LG CBIS3618B Manual Del Propietário

Ocultar thumbs Ver también para CBIS3618B:
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

us_main.book.book Page 15 Friday, August 19, 2022 2:09 PM
Green Wire (Ground)
e
UL-listed Conduit Connector
f
Black Wires
g
Junction Box
h
White Wire (No Connection)
i
Installing the Cooktop Unit
1
Visually inspect the cooktop for damage.
Make sure all cooktop screws are tight (see
below for locations).
3 Screws (Same Both Side)
a
4 Screws (Same Both Side)
b
2
Check and prepare the installation location.
• See Dimensions and Clearances.
3
Carefully lower the cooktop into the
countertop cutout, making sure not to trap
any wires.
NOTE
• Do not use caulking compound. The cooktop
must be removable, should service be required.
4
Attach the retainer brackets
of the cooktop; then snug the bolts against
the bottom of the countertop as shown.
NOTE
• The retainer brackets MUST be installed to meet
local codes or, in their absence, with the National
Electrical Code ANSI/NFPA No. 70, latest edition.

Final Check

Perform a final operational check of the cooktop,
making sure the cooktop powers on properly and
that each cooking zone operates correctly. Refer to
the Operating Instructions in this guide for details.
to the bottom
a
INSTALLATION
Cooktop
a
Countertop
b
Bolt
c
Retainer Brackets
d
Type A Screw
e
15
Tabla de contenido

Solución de problemas

loading

Tabla de contenido