Ocultar thumbs Ver también para RGM19412 Serie:
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

ASSEMBLY

STEP 4
1
M8x42mm
Upright Ground
4
Bolt (x2)
Stake (x1)
(13)
(12)
STEP 5
2
Tensioning
10
Device (x1)
1
3
M8 Arc
12
Washer (x2)
(1)
(4)
Tie the ends of all the three guide line cords (10) to the second lug bolt
(the one facing the opposite direction from the others lug bolts). You will
use these lines to secure and straighten the volleyball net pole.
Using only one guide line, thread the free end of the line through the
Guide Line
first three holes of one tensioning device (2). See the example below.
Cords (x3)
2
With the net pulled tight, push the upright
ground stake (4) into the ground at the
location of the pole. Now attach the
upright ground stake to the lower upright
pole (8) with 2 M8x42mm bolts (1), 2 M8
arc washers (12), and 2 M8 locknuts (13).
13
M8 Locknut
(x2)
1st
2nd
8
3rd
Tabla de contenido
loading

Tabla de contenido