Please read completely through the instructions and verify that all listed parts and hardware are present
before beginning assembly.
P- Lower Mattress Side Rail
(Qty. 1)
S- Side Stretcher
(Qty. 6)
V- Long Ladder
(Qty. 1)
(1) 1/4" x 1/2" Bolt
(Qty. 160+2 extra)
Parts and Hardware List
Q- Lower Ladder Side Rail
T- Side Panel
(Qty. 6 )
W- Short Ladder
(Qty. 1)
(2) 1/4" x 1-1/4" Bolt
(Qty. 8+1 extra)
Tools required: Hex wrench (provided).
5
(Qty. 1)
(3) Plastic Round Plug
(Qty. 16+1 extra)
R- Side Frame
(Qty. 4)
U- Mattress Support Slats
(Qty. 21)
X- Connector Tube
(Qty. 8)
Hex Wrench
(Qty. 2 )