Kichler 310080 Manual De Instrucciones página 8

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

HANGING THE MOTOR ASSEMBLY (continued)
Step 4. Carefully feed fan wires and safety cable up through the downrod.
Thread the downrod onto the motor coupling until the clevis pin holes
are aligned. Next, replace the clevis pin and hairpin, then tighten both set
screws. (Fig. 8)
Step 5. Slip the coupling cover, canopy hole cover and canopy onto the
downrod. Carefully reinstall the hanger ball onto the downrod. Make sure
the cross pin is in the correct position and the set screw is tight and the
wires are not twisted . ( Fig. 9)
CAUTION: Ensure all screws are tight before moving to the next step.
8 | KICHLER.COM
Downrod
Motor
Coupling
Fig. 8
Hanger Ball
Canopy
Canopy Hole Cover
Coupling Cover
Downrod
Fig. 9
Clevis Pin
Hairpin
Set Screw
Cross Pin
Tabla de contenido
loading

Este manual también es adecuado para:

310130

Tabla de contenido