Leggett & Platt G-SMR-2 CUSTOM Manual De Operaciones página 5

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

ac J boX / dc motor without power down box programming procedure
For adjustable bases equipped with AC J box or DC motor only—no power down box.
When programming the remote control, unplug
the adjustable base electrical power cord. Wait
30 seconds, then plug the cord back into the
power source. This process automatically sets
the bed to the program mode for 90 seconds.
For convenience, use this procedure in lieu of
pressing the learn button (located on the AC
J Box, mounted to the underside of the base
frame).
In case of a power outage, press and hold the
learn button on the power down box to lower
the base to the flat position (FIGURE 1).
This function is only for lowering the base and
will not operate the base to any other position.
The two (2) 9 volt batteries should be replaced
after this function is used.
In the event the power down feature does not
work, check to make sure the two (2) 9 volt
batteries are good.
The power down box is factory wired to the motor,
but the box itself is mobile and can be placed
anywhere under the adjustable base on the floor.
Position the power down box near your remote
control when programming for best results.
POWER DOWN BOX BATTERY INSTALLATION
STEP 1
PRESS IN (SLIGHTLY) AND
PUSH DOWN TO REMOVE
BATTERY COMPARTMENT
DOOR
Note that this programming feature is only
applicable to bases without a power down box.
Power down equipped adjustable bases require
use of the learn button on the power down box
when programming the remote control.
power down boX operation
FIGURE 1: Power down box learn button.
STEP 2
G-SMR-2 Custom Remote Control Operation Guide 99300822-e
LEARN
BUTTON
BATTERY ORIENTATION IS
INDICATED INSIDE BATTERY
COMPARTMENT
TABS
POWER
DOWN BOX
DOOR INSTALLATION:
PRESS COMPARTMENT
DOOR AGAINST THE
BATTERY ENDS, SLIDE
DOOR UP AND IN TO
ENGAGE THE DOOR
TABS
5
Tabla de contenido
loading

Tabla de contenido