Robern CRAFT Serie Instrucciones De Instalación página 5

Ocultar thumbs Ver también para CRAFT Serie:
Tabla de contenido
CHESTNUT HILL 24 / SENDAI 24
4. Apply a 1/4" (6mm) bead of silicone sealant on vanity and sink lip and lower the stone top onto the silicone sealant.
NOTE: The back edge of the stone top must be flush against the wall and equal left and right overhang on each side of the vanity.
5. Verify that the stone top is level. If the stone top is not level, gently press down on the stone top.
6. Wipe away excess silicone sealant. allow the sealant to set according to the sealant manufacturer's instructions.
7. Connect the trap to the drain. Complete the faucet connections. Vanity drawers can be removed for easy access. Run water and
check for leaks.
4
6
© 2021 Robern, Inc. 701 N. Wilson Ave. Bristol, PA 19007 U.S.A.
800.877.2376
www.robern.com
5
7
5
Part no. 209-1397 09/20/2021
Craft Series Engineered Stone Top
Tabla de contenido
loading

Tabla de contenido