Important Considerations - EKSELANS CM IP-TC 082017 Manual De Usuario

Receptor ip - modulador cofdm/qam
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

CM IP-TC
MOUNTING AND INSTALLING

IMPORTANT CONSIDERATIONS

• Once mounted the FA 524 PSU, connect in series (on the right) the different CM modules by using the 14-lines connection cables. FA 524 must be at the left
• In case of using a FA 55 PSU, do not connect the different CM modules. Make the programming module by module by using the CM PR connected at the left port of each
module
• Check the power consumption of the different modules. As a general rule, a FA 524 will wupport up to 6 CM Headend modules. Anyhow it is recommended to check the
consumptions
• Modules with COFDM/QAM RF output, can be connected at the output by the long mixing bridge in order to mix output signal between adjacent modules
• Adjust the attenuation level of each module in order to compensate high frequency attenuation
EN
12
Tabla de contenido
loading

Tabla de contenido