Assembling The Equipment; Wiring Diagram - Gianni Ferrari GSR 200 Manual Del Operador

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 69

9. ASSEMBLING THE EQUIPMENT

9.1 ASSEMBLING THE MULCHING PLATE
1) Let the lifting arms of the engine couple with the attachments present on the equipment
2) Insert the locking pins and the safety split pins
3) Loosen the belt tensioner.
4) Mount the belt.
9.2 ASSEMBLING THE SNOW BLADE
1) Let the lifting arms of the engine couple with the attachments present on the equipment.
2) Insert the locking pins and the safety split pins.
10. USING CONTROLS AND INSTRUMENTS
10.1 FORWARD - REVERSE
10.2 PARKING BRAKE
10.3 BY-PASS
IMPORTANT:
Avoid towing the machine for long stretches with inserted by-pass.
10.4 HAND THROLLE
10.5 P.T.O
See figure 10.5
10.6 PLATE HEIGHT ADJUSTMENT
Pay attention to possible crushing, use the special lifting handles.
10.7 FUEL TAP
See figure 10.7
10.8 PLATE HEIGHT ADJUSTMENT

11. WIRING DIAGRAM

11.0 COLOUR PALETTE
A
Sky-blue
G
Yellow
B
White
H
Grey
C
Orange
L
Blue
26
See figure 9.1
See figure 9.2
See figure 10.1
See figure 10.2
See figure 10.3
See figure 10.4
See figure 10.6
See figure 10.8
M
Brown
N
Black
R
Red
S
Pink
V
Green
Z
Violet
THIS SIMBOL INDICATE
THE EARTH
Tabla de contenido
loading

Tabla de contenido