Axis Communications T99A10 Guia De Instalacion página 21

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 135
All manuals and user guides at all-guides.com
AXIS T99A10 Positioning Unit 24 V AC/DC
1
Power cable (not included)
2
I/O cable (optional, not included)
3
Network cable (not included)
4
Cable gasket
5
Transparent base unit cover
8. Fit cable gaskets on the cables. See Cable thickness on page 38.
9. Insert the power, I/O and network cables including the cable gaskets through the holes in
the transparent base unit cover and arrange the cables as shown in the illustration above.
NO TICE
TICE
NO
NO
TICE
If you use both an optical fibre cable and an RJ45 cable for network connectivity, route
the optical fibre cable through the same cable gasket as the I/O cable. Apply a sealant
between the cables and the cable gasket to prevent leakage. For more information on
different network connectivity options, see .
10. Replace the transparent base unit cover on the base unit and fit the cable gaskets inside
the holes.
21
EN
Tabla de contenido
loading

Tabla de contenido