5. Commissioning

For commissioning, fill all tanks and the sampling unit with fresh water.
The two-pin earthed plug of the cabinet must be connected to the power socket. Now the PP cabinet con-
trol starts.
Please read and note the operating manual before start-up!
Operation and maintenance are in alignment with the operation manuals of the
one2clean plus. The operating manuals describe operation of the control in detail as
well.
You can download the operating manual from our website:
UPone (operating manual one2clean plus):
https://www.graf-water.com/
fileadmin/media/EBA_Betriebsbuch_one2clean_plus_one2clean_plus_XXL_EN.pdf
5. Commissioning