Assembly Installation - Glacier bay 2190SSHD Guía De Uso Y Cuidado

Barra organizadora premium
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Installation (continued)
6

Assembly installation

noTe: Make sure each end of the assembly is touching
the ceiling and tub ledge or shower stall floor.
noTe: Do not over tighten the twist tube (C) as this may
cause damage to the internal lock.
□ Lift the entire assembly into its final location.
□ While holding the small tube of the twist tube (C), pull the
large tube down to increase the assembly height.
□ Secure the assembly into place by twisting the larger tube of
the twist tube (C) counterclockwise 4 to 6 times
or until tight.
7
Add tape strips to the tube seams
□ Place the tape strips (DD) around the seams of the tubes.
hold the small tube
pull the large tube
down and tighten
(2 full turns)
DD
7
Please contact 1-855-HDGLACIER for further assistance.
C
HOMEDEPOT.COM

Capítulos

Tabla de contenido
loading

Este manual también es adecuado para:

892 204

Tabla de contenido