5. Commissioning, operation
To increase the service life of the contacts, we recommend
operation with a contact protection relay.
Connection diagrams, see product label
5.4 Commissioning
Switch on the voltage supply of the connected control device. Fill the
vessel and the check the switch points of the float switch for function.
WARNING!
Physical injuries and damage to equipment
A fault with the electrical functional check can lead to a
malfunction in the plant and thus lead to injury to personnel
or damage to equipment.
▶
Ensure that the functional check does not start any
unintended processes.
▶
Do not carry out a functional check during operation or
when actively controlling.
Always observe the mounting and operating instructions of accessories
when commissioning them.
WIKA operating instructions models RLS-7000, RLS-8000
EN
15