aden+anais Play + Discover Activity Gym Manual De Instrucciones página 5

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 52
4. Flip the hub and arches over, so that
the arched legs are facing down, in an
open tripod position.
5. Attach the wooden arches to the
mat by looping the fabric fastener from
the mat through the bottom opening
at the base of each arch, and securing
to the hook and loop on the underside
of the mat.
1002 Activity Gym Manual_8.indd 5
1002 Activity Gym Manual_8.indd 5
4.
5.
5.
5
3/25/21 1:16 PM
3/25/21 1:16 PM
Tabla de contenido
loading

Tabla de contenido