Product : SIGNAKID
2 FIXING & ASSEMBLY
For guidance as to how to secure & then assemble Lucy & Luke, please refer to pages 1
& 2 above.
2.1
:
ADVICE
ASSEMBLY
1. Using a degreasing agent, clean the areas where the stickers and reflective strips will
be applied. Gently apply the stickers by maintaining pressure for a few seconds. Leave
to stand for 48/72 hours to ensure a solid bond with the plastic.
2. Follow the installation and assembly instructions (above) step by step.
3. To ensure a sufficiently robust installation, please respect the recommended dimensions
for the concrete base (figure 1, page 2). We advise that your concrete base contains
350kgs of cement per m
4. Pass your hook anchors through the holes in the template & then secure them with the
washers/bolts supplied. The threaded part of the bracket should be aligned with the
template such that the 30mm of threaded tube is visible from above. You can then place
the template (with the hook anchors attached) on top of the concrete base with the hook
end sunk into the mix. Once the concrete has sufficiently solidified you can remove the
template leaving only the threaded part of the hooks visible.
5. Allow 24/48 hours for the concrete to harden, such that the bond between the hook
anchors is sufficiently solid. You can now pass on to step 4 (see above)
3
CARE OF YOUR SIGNAKIDS
3.1 P
LASTIC ELEMENTS
Regular cleaning of plastic surfaces will help ensure a long product life (as well as keeping up
appearances!). We suggest that you use soapy water or a well diluted water/white vinegar mix.
A High Pressure washers used with a bleach solution will also work. Do pay attention to NOT
use acidic cleaning products.
Référence document : MIU-0013-A_Signakid Emma & Théo
Date MAJ : 22/07/2021
Ce document est la propriété d'ELANCITY. Ne peut être transféré à un tiers sans autorisation préalable.
USER GUIDE
3
.
12 / 31