Master Plumber 220193 Manual Del Usuario página 5

Bomba de chorro para pozo poco profundo
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Installation
4. HOLD THE PIPE, remove pipe clamp
and slide well seal over rigid PVC
pipe and onto well casing. Position
assembly so that twelve inches of
rigid PVC pipe protrude from well
seal. Alternately turn bolts on well
seal clockwise until rubber gaskets
are tight against well casing and
rigid PVC pipe.
5. Cement 1-1/4" PVC elbow onto rigid
PVC pipe protruding from well seal. If
desired, some length may be cut off
of rigid PVC pipe before cementing
elbow. Use a round file or knife to
smooth the inside of any rigid PVC
pipe that has been cut.
6. Thread a 1-1/4" male PVC adapter into
the front of pump. Hand tighten, then
turn 1/4 turn with wrench.
7. Cement
as many
sections and
couplings
of PVC pipe
needed to
connect the
PVC elbow to the 1-1/4" male PVC adapter in the front of the
pump.
8. Apply 2-3 wraps of PTFE pipe
thread sealant tape tape to the male
threads on the discharge tee. Using
pipe wrench, thread discharge tee
into top of pump. Remove pressure
gauge plug from top of discharge
tee.
9. Prime pump as described in Priming the Pump.
10. Apply 2-3 wraps of PTFE pipe thread
sealant tape tape to plug and gauge
threads. Thread pressure gauge
plug into discharge tee and thread
pressure gauge into pressure gauge
plug. Make sure all connections are
tightly sealed.
11. Complete all electrical connections as described in Wiring
Your Pump.
12. Screw 1" male PVC adapter
into discharge tee outlet.
APPROX.12"
OF PVC PIPE
PROTRUDING
FROM
WELL SEAL
WELL
SEAL
7128 1016
13. Thread 10" x 1" nipple into
pressure tank. Thread tank
cross into nipple so that the
two 1/4" holes in tank cross
face upward. Plug two outlets
1-1/4"
PVC
on tank cross with two 1/4"
ELBOW
plugs.
TOP OF
PVC PIPE
PROTRUDING
FROM WELL
14. Thread 1/2" boiler drain into front
SEAL
of tank cross. Thread 1" male
PVC adapter into inlet side of
7129 1016
tank cross. Connect household
plumbing to other side of tank
cross.
1-1/4" PVC PIPE
15. Cement as many sections and couplings of rigid 1" PVC pipe
needed to connect the 1" male PVC adapter in the discharge
tee to the 1" male adapter on the tank cross inlet. Set
pressure in the pre-charged pressure tank to
2 pounds less than the cut-in pressure of the pump. If the
cut in pressure is 30 PSI, then the correct tank pre-charge is
7127 1016
28 PSI. If the cut in pressure is 20 PSI, then the correct tank
pre-charge is 18 PSI. Total installation should look like the
shallow well drawing below.
PRESSURE
GAUGE
PLUG
DISCHARGE
TEE
16. Priming Instructions - Before
starting the pump, fill the
pump body and as much of the
suction line as possible. Open
7161 0117
a faucet or two in the house.
Start motor. If pump is offset
from well 4 feet or more, it
may take a few minutes for
pressure to build. If pressure
PRESSURE
fails to build within five
GAUGE
minutes: Stop motor, remove
pressure gauge plug from discharge tee, add more water, try
again.WELL POINT PUMP INSTALLATION
7162 0117
5
1" MALE PVC
ADAPTER
7163 0117
1/4" PLUGS
TANK
NIPPLE
CROSS
7130 1016
1/2"
BOILER
DRAIN
1" MALE
PVC ADAPTER
7131 1016
7164 0117
Tabla de contenido
loading

Tabla de contenido