Installation - Glacier bay 874-0101 Guía De Uso Y Mantenimiento

Ocultar thumbs Ver también para 874-0101:
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Installation

1
Preparing for installation
CAUTION: Always turn off the water supply before
removing an existing faucet or replacing any part of a
faucet. Open the faucet handle to relieve water pressure
and ensure that the water is completely shut off.
Shut off the water supply to the tub and
shower.
Verify that the hole sizes and positions of the
holes in the wall are correct:
The shower and tub spout outlet holes
should be 1-1/4 in. diameter.
The valve access hole should be 6 in.
diameter.
The recommended valve depth to the
nished wall is 2 in. min. to 2-1/2 in. max.
Ensure that the valve body (D) cover is ush
with the nished exterior surface of the wall.
Position the valve body (D) correctly in the
wall with the "UP" pointing up. The 8 in.
minimum from the valve body to the tub
spout is required for proper operation.
1 1/4 in. Diamter
1 1/4 in. Diameter
30 in.
Shower Only
48 in.
Tub & Shower
6 in.
Diameter
D
48 in.
Shower Only
8 in. Min.
30 in.
Tub & Shower
2
Removing the plaster guard
Unscrew the screws (K), and remove the
plaster guard (L).
K
5
Please contact 1-855-HD-GLACIER for further assistance.
L
HOMEDEPOT.COM

Capítulos

Tabla de contenido
loading

Tabla de contenido