Sanus Systems VM2 Instrucciones De Montaje página 4

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 5
Diagram 1
Diagram 2a
i
h
c
Step 2b - Attaching to the Wall: Hardware for wood stud mounting is provided. For
all other mounting applications contact a local contractor or hardware store. Use a high
quality stud sensor to locate a stud. It is a good idea to verify the stud location with an
awl or thin nail as shown in Diagram 2. Use the Wall Plate (c) as a template to mark the
two hole locations on the wall. Make sure these holes are aligned vertically and centered
over the stud. Pre-drill the two holes to a depth of 2.5" using a 3/16" drill bit. Attach the
Wall Plate to the wall using the two Lag Bolts (d) as shown in Diagram 2b. Tighten the
Lag Bolts firmly with the Allen Key (b).
Step 3 - Add Monitor Mount to Wall Plate: Once the LCD TV is attached to the
Monitor Mount (a), and the Wall Plate (c) is properly installed, set the tapered hole in
the Monitor Mount down over the cone shaped bushing on the Wall plate. This process
is shown without the TV in Diagram 3 so that you can see the parts more clearly. Make
sure the Monitor Mount is seated completely onto the Wall Plate. Add the Large Washer
(j). Next add the Cap (k). Make sure the square cut into the cap fits over the square top
of the Wall Plate bushing. Finally place the Knob (m) through the Small Washer (l), the
Cap and into the cone shaped bushing. You can now set each of the knobs to the desired
level of tension.
Note: For institutional or heavy load applications a Knob Replacement
bolt (f) may be used in place of each Knob and tightened with the Allen
Key provided. This will allow you to get greater tension while still being
able to adjust the position of your TV.
Detailed View
e
a
Diagram 2b
d
g
c
Diagram 2
Diagram 3
m
l
k
square cut in cap
j
a
square end of
bushing
c
loading