Installation; Boiler Fixing - Riello FS15 Instrucciones De Instalación, Uso Y Mantenimiento

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

TEST BOILER
The working field has been defined according to EN 676 standard.
COMMERCIAL BOILERS
The burner-boiler matching is assured if the boiler conforms to EN 303 and the combustion chamber dimen-
sions are similar to those shown in the diagram EN 676. For applications where the boiler does not conform to
EN 303, or where the combustion chamber is much smaller than the dimensions given in EN 676, please con-
sult the manufacturers.
CORRELATION BETWEEN GAS PRESSURE AND BURNER OUTPUT
To obtain the maximum output, a gas head pressure of 5.3 mbar is measured (M2, see chapter 3.3, page 4) with
the combustion chamber at 0 mbar using gas G20 with a net heat value of 10 kWh/Nm
6.0
5.5
5.0
4.5
4.0
3.5
3.0
D5091
3.

INSTALLATION

THE BURNER MUST BE INSTALLED IN CONFORMITY WITH LEGISLATION AND LOCAL STANDARDS.

3.1 BOILER FIXING

IMPORTANT
Boiler door must have a max. thickness of 100 mm,
refractory lining included.
If thickness is greater (max. 260 mm), a combustion
head extension must be fitted, which is supplied
separately.
HINGE
ASSEMBLY
2737
80
100
70,000
90,000
S7393
120
140
110,000
130,000
Separate the combustion-head assembly
from the burner body by removing nut (1) and
removing group (A).
Fix the head assembly group (B) to the boiler
(2) insert the supplied insulating gasket (3).
A
3
GB
3
(8,570 kcal/Nm
160
180
kW
150,000
kcal/h
Thermal power
1
3
B
3
).
2
D5097
Tabla de contenido
loading

Este manual también es adecuado para:

3756803

Tabla de contenido