IN-GROUND
POWER LIFT
BASKETBALL SYSTEM
MODEL #60091
MODEL 90962
BEFORE ASSEMBLY:
• Requires at least 493 lb (224 kg) of cement mix to fi ll a
3
3
volume of 3.7 ft
(0.105 m
).
• Requires 3+ days for concrete to cure, plus 3-4 hours
to complete assembly steps.
• 3+ people recommended for setup.
SAVE THIS INSTRUCTION IN THE EVENT THAT THE MANUFACTURER
HAS TO BE CONTACTED FOR REPLACEMENT PARTS.
TOOLS REQUIRED
1/2" (13 mm)
(x2)
(x1)
(493 lb)(224 kg)
(x1)
QUESTIONS?
CONTACT LIFETIME CUSTOMER SERVICE:
Call: 1-800-225-3865
7:00 am–5:00 pm (Monday–Friday) MST
and 9:00 am–1:00 pm Saturday MST
™
7/16" (11 mm)
9/16" (14 mm)
(x2)
(x2)
(x1)
(x1)
Cement Mix
Rebar
(3')
Live Chat:
www.lifetime.com
Video Instructions:
www.youtube.com/lifetimeproducts
ASSEMBLY INSTRUCTIONS
Pour le français, voir la page 2. Para el español, ver la página 3.
3/4" (19 mm)
(x2)
(x1)
(x1)
(x1)
For Customer Service in Mainland
Europe and the United Kingdom,
TABLE OF CONTENTS
Icon Legend................................4
Notices....................................5
Initial Set Up..............................6
(x1)
Pole Assembly..........................12
Backboard to Rim Assembly.......16
Backboard to Pole Assembly.......22
Parts Identifi er..........................i - iv
(x1)
Handle Assembly.......................26
Final Assembly..........................32
Maintenance Instructions..........38
Warning Sticker........................39
Registration........................40
Warranty................................41
(x1)
Model Number: 90962
Product ID: