Overall View; Preliminary Checks - electrovolta 900SC-400CS Manual De Instrucciones

Motorreductor para cancelas correderas
Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 42

OVERALL VIEW

Key selector
Photocell
Bollard

PRELIMINARY CHECKS

Before starting installation it is recommended to carry out the following checks and
operations:
1_The structure of the gate must be solid and appropriate.
2_During the run, the gate must not present excessive side disbandment.
3_The lower wheels/rail and the higher roller/guide systems must work without excessive friction.
4_To avoid the disbandment of the gate, sliding gate check stops, both in aperture and in closure, and a
second higher roller/guide must be installed in compliance with current regulations.
5_In pre-existing gates remove any manual lock.
6_Lay the ducts for the energy supply (Ø25-50mm) and for the outside connection (photocell, flashing
device, key selector, etc.) to the base of the gate.
flashing light
gear motor
15
GB
Fig. 1
Tabla de contenido
loading

Tabla de contenido