Premier SOL-5532 Manual De Instrucciones página 16

Sistema de energía solar
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

The above circuit diagram is just for reference.
Caution
If the the sunshine is not good enough, you can charge the battery by the external battery charge by the
AC power.
8. Installation and Operation
Step 1:
1. After you get the solar power system, you would have three packages, one is host, one is battery, and
the other is solar panel.
2. Check all the packages and units are not damage. Contact Premier if anything is damaged or missing.
3. Open the host package, there are a user manual, a host and a set of connecting cable.
4. Read the user manual firstly.
Note: Keep the breaker and power switch off, and then follow the below steps.
5. Open the part
No.23 cover of the battery part by screwdriver.
6. Open the battery packages, take out the battery and put it into the battery housing. Connect the
battery positive(red connector) to the red cable (part No 20). Connect the negative(black connector) to
the black cable (part No 19).
Never mis-connection. Connect tighten reliably.
7. Assemble the cover of the battery part back to the host.
Note: Keep this host indoor use only.
Step 2:
1.Take out the solar panels, put the solar panel outside and make it face to the sun: connect the cable
with the machine indoor, the battery is charged once the solar panel is connected the machine when
there is sunshine. (If this is the first time you use this machine, please charge for 3 continuous days and
then discharge the load, if the sunshine is not good, please charge the battery by the 12V external
battery charge from the city power by the qualified person guide.)
Tabla de contenido
loading

Tabla de contenido