1. TECHNICAL DATA
Battery power
Solar panel
Accessories power supply (0-1)
Nominal
Peak
E.B. loss
Motor power
Torque max
Opening time
Rod length (max)
Intermittence
Degree of protection
Temperatur
Weight
2. REFERENCE TO ILLUSTRATIONS AND ACCESSORIES
2.1 Standard installation references (fig. 1)
ATTENTION: Only use DITEC's safety devices and accessories for installation.
[1] Radio
[2] Flashing light
[3] Key selector
2.2 Geared motor references (fig. 3, 4 and 8)
[7] Fixing base
[8] Container
[9] Rod holder attachment
[10] Key release
[11] Rod
[12] Geared motor
[13] Encoder group
[14] Transmission lever
[15] Internal mechanical lock
2.3
Accessories
-
UP4BC Rectangular (30x100) net span arm 3500 mm
-
UP4BL Rectangular (30x100) net span arm 4500 mm
-
UP4M
Spring Ø 5
-
UP4MP Spring Ø 3.5
-
UPSN
Articulated joint for UP4BC/4BL arms
3.
INSTALLATION
Unless otherwise specified, all measurements are expressed in millimetres.
Barrier installation
3.1 Lay a concrete foundation with buried anchoring brackets and the base plate, making sure that it is perfectly
level and smooth. Insert appropriate elements in iron or any other suitable material into the holes of the
anchoring hooks so as to permit fixing to the concrete reinforcement. Route the cable ducts through the
central hole of the plate (fig. 3). Attention: ensure that anchoring is sturdy and stable.
3.2 Fasten the group.
Reversal of the direction of the rod
The UP4EHS Series barriers are normally supplied in the right-hand version. By right barrier we mean that the
container is assembled on the right, as seen from the side that can be inspected. To transform the barrier from
right to left:
3.3 Disassemble the top attachment for spring: screw [21], upper spring coupling bracket [22] and nut [23] (fig. 8).
3.4 Rotate the lever arm 90° (fig. 8).
3.5 Disassemble the trasmission lever [14] from the lever arm [16] and reassemble it with the top attachment
for spring: screw [21], upper sbring coupling bracket [22] and nut [23] (fig. 8). ATTENTION: Use the screw
[21] and nut [23] of the upper spring coupling to assemble.
3.6 Move the electrical board and the batteries on the opposite side.
3.7 Position the DIP2 on ON (fig. 10).
UP4EHS
2x12 V
2x12 V
/ 6.5 Ah (BATK2 opzional)
2x12 V
/ 24÷50 Ah (not supplied by us)
2x12 V
/ 14 W (SolarP)
2x12 V
/ 40÷100 W (not supplied by us)
24 V
/ 0.3A
24 V
/ 0.5A
8 mA
100 W
45 Nm
1.5÷4 s / 90°
4700 mm
S2 = 7 min / S3 = 15%
IP45
-15 °C / +50 °C
40 kg
[4]
SolarP
[5]
Barrier
[6]
Photocells
[16]
Lever arm
[17]
Top attachment for spring
[18]
Spring
[19]
Spring adjustment tie rod
[20]
Electric board
[21]
Screw TE M12x110 galvanized
[22]
Upper spring coupling bracket
[23]
Self-locking nut galvanized
- UPAM
- UPGR
- UPC
- UPAF
- RHIPBG50+HIPBTA Border+plug
13
/ 2 Ah
Mobile bearing
Aluminium fence L= 2000 mm
Set of 10 red reflectors
Fixed bearing
DITEC S.P.A - IP1597 - UP4EHS