Bradley S19-320EXP120 Instalación página 2

Sistema de alarma del interruptor de flujo, clase i, división i, grupos c y d, a prueba de explosiones (incluye las versiones de 120v y 220/240v)
Ocultar thumbs Ver también para S19-320EXP120:
Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Read this installation manual completely to ensure proper installation, then file it
with the owner or maintenance department. Compliance and conformity to drain
Installation
requirements and other local codes and ordinances is the responsibility of the
installer.
Separate parts from packaging and make sure all parts are accounted for before
Packing List
discarding any packaging material. If any parts are missing, do not begin
T H
IS
E
installation until you obtain the missing parts.
S ID
U P
Flush the water supply lines before beginning installation and after installation is
complete. Test the unit for leaks and adequate water flow. Main water supply to
the eyewash should be "ON" at all times. Provisions shall be made to prevent
unauthorized shutoff. Flushing fluid should be tepid per ANSI Z358.1.
The inspection and testing results of this equipment should be recorded weekly
to verify proper operation. This equipment should be inspected annually to
ensure compliance with ANSI Z358.1.
Workers who may come in contact with potentially hazardous materials should
be trained regarding the placement and proper operation of emergency
equipment per ANSI Z358.1.
P.O. BOX 309, MENOMONEE FALLS, WI 53052-0309 USA
TEL: 1-800-BRADLEY
FAX: (262-251-5817)
http://www.bradleycorp.com
114-051
2
netzerotools.com
WARNING
1/19/11
netzerotools.com
Installation
Tabla de contenido
loading

Este manual también es adecuado para:

S19-320exp1aS19-320exp1bS19-320exp220

Tabla de contenido