GE AHY18 Manual De Usario página 12

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Installation Instructions
7. COMPLETE INSTALLATION
A. Insert the foam seal behind the top of the lower
window sash and against the glass of the upper
window.
A
A. Top of lower window sash
B. Foam seal
B
in the window lock bracket and into the upper
window.
CAUTION
To prevent broken glass or damage to windows,
on vinyl or other similarly constructed windows,
attach the window locking bracket to the window
side jamb with one Type B screw.
C. Attach the window lock bracket to the upper
window with a type C screw to secure the
window in place.
12
8. RETURN CHASSIS TO THE
A. Once the case is securely attached to the
window, reinstall the air conditioner. Have two
people lift the air conditioner and slide it into the
B
case. Make sure that the corded front panel
is positioned so that it does not interfere with
sliding the air conditioner into the case.
B. Snap the front grille back onto the air
beginning of the installation to secure the grille.
Re-use screws from Step 3 on page 9.
C. Measure and cut adhesive foam backed sheet.
Apply over side curtain and frame.
Side Curtain
Wood
Weather
D. Plug into a grounded 3-prong outlet.
E.
Electrical Requirements.
OUTER CASE
Foam
Seals
Press RESET on the power supply cord. See
49-5000470 Rev. 0

Capítulos

Tabla de contenido
loading

Este manual también es adecuado para:

Ahy24

Tabla de contenido