Installation - ELICA ELI136S2 Guía De Instalación, Uso Y Mantenimiento

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Installation

Mounting the range hood blower
Slide the rear mounting plate flange under the bracket.
A.
Bracket
B.
Blower mounting plate
Push the front end of the mounting plate up and snap into
spring tab.
NOTE: The spring tab should be outside of the slot in the
mounting plate.
A.
Blower mounting plate
B.
Align mounting holes and install 4 - 6 x 16 mm screws.
A
B
A.
Screw with lock washer
B.
Attach power cord connector to connector on wire box on
blower motor mounting plate.
A
A
B
Spring tab
Mounting hole
Ceiling support structures
This vent hood is heavy. Adequate structure and support
must be provided in all types of installations.
At the hood location, install 2"x 4" cross framing between
ceiling joists as shown (2"x 4" are required to support
the weight of the hood).
B
Arrange cross framing in the ceiling to suit the existing
structure.
Your ceiling joists will be like one of the following:
NOTE: Top view ceiling joists
parallel to front of hood
16"
(17.9cm)
(40.6 cm)
joist spacing
NOTE: Top view ceiling joists
parallel to front of hood
16"
(40.6 cm)
joist spacing
(17.9cm)
NOTE: Top view ceiling joists
parallel to front of hood
10
" (25.5 cm)
1
1 6
install cross-framing
symmetrically over
duct/cooktop
(17.9cm)
(40.6 cm)
joist spacing
Hood front
Example A
10
" (25.5 cm)
1
1 6
install cross-
framing
symmetrically
over duct/cooktop
Centerline
Ø 8
" (21
7
"
1
1
4
1 6
cm) duct
Align duct to
center of cooktop
Hood front
Example B
10
" (25.5 cm)
1
1 6
install cross-
framing zz
symmetrically
over duct/cooktop
Centerline
7
"
1
Ø 8
" (21
1
1 6
4
cm) duct
Align duct to
center of cooktop
Hood front
Example C
Centerline
2 x 4 cross
7
"
1
Ø 8
" (21
1 6
1
4
cm) duct
16"
Align duct to
center of cooktop
2 x 4 cross
framing
Cooktop
outline
2 x 4 cross
framing
Cooktop
outline
framing
Cooktop
outline
7
Tabla de contenido
loading

Este manual también es adecuado para:

Eli142s2

Tabla de contenido