EuroLite Color-Changer Set Manual Del Usuario página 17

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

1. Trussing
2. Hook
3. Mounting-bracket
4. Fixation screw
5. Fixation ring
6. PAR-36 lamp
7. Pinspot housing
8. Safety bond hole
9. Safety bond
10. Quick link
or:
Mount the Pinspot with the mounting-bracket to the desired installation spot.
Do only use an appropriate screw and make sure that the screw is properly connected with the ground.
For overhead use, always install an appropriate safety bond.
You must only use safety bonds complying with DIN 56927, quick links complying with DIN 56926, shackles
complying with DIN EN 1677-1 and BGV C1 carbines. The safety bonds, quick links, shackles and the
carbines must be sufficiently dimensioned and used correctly in accordance with the latest industrial safety
regulations (e. g. BGV C1, BGI 810-3).
Please note: for overhead rigging in public or industrial areas, a series of safety instructions have to be
followed that this manual can only give in part. The operator must therefore inform himself on the current
safety instructions and consider them.
The manufacturer cannot be made liable for damages caused by incorrect installations or insufficient safety
precautions!
Pull the safety bond through the hole in the mounting-bracket and over the trussing system or a safe fixation
spot. Insert the end in the quick link with screw cap and tighten the safety screw.
The maximum drop distance must never exceed 20 cm.
A safety bond which already hold the strain of a crash or which is defective must not be used again.
Adjust the desired inclination-angle via the mounting-bracket and tighten the fixation screws.
DANGER TO LIFE!
Before taking into operation for the first time, the installation has to be approved by an expert!
17/35
00026952.DOC, Version 2.1
Tabla de contenido
loading

Tabla de contenido