Installation In New Construction; Wall Inlet Rough-In - Broan NuTone CV850 Manual Del Usuario

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

INSTALLATION IN NEW CONSTRUCTION

WALL INLET ROUGH-IN

Once the locations for wall inlets have been determined, mount
all inlet brackets.
1. Choose the appropriate mounting bracket for the inlet being
installed. (See chart.)
NuT one Inlet
330 Series
360 Series
CI370 Series Indicating Inlet
CI390 Series Electrified Inlet
2. To locate bracket on wall stud, measure approximately 18" up
from finished floor level. (Height may vary according to
individual preference.)
MODEL 361 (FOR USE WITH CI370 AND 360 INLETS)
3. Refer to Figure 7. Nail bracket to side of stud so that front
edge of bracket is flush to front of stud. (The bracket may also
be nailed to the front edge of the stud. See face mounting
illustrated. For face mounting, use locating tabs on bracket for
proper alignment.)
4. Refer to Figure 8. Remove cardboard from plaster guard
frame. Using four (4) provided screws, attach the appropriate
flanged fitting and inlet seal to back of inlet.
5. Replace cardboard in plaster guard frame.
MODEL 329 (FOR USE WITH 330 INLETS)
6. When using Model 329, glue elbow to mounting plate. Attach
to stud as shown in Figure 9.
4
All manuals and user guides at all-guides.com
Rough-in
329
361
361
CI390RK
SIDE
MOUNTING
3
2
/
"
8
FIGURE 7
FIGURE 8
MODEL 361
FACE
MOUNTING
13
1
/
"
16
MODEL 329
FIGURE 9
Tabla de contenido
loading

Tabla de contenido