Uline H-4039 Guia De Inicio Rapido página 2

Conectores para estaciones de trabajo para control de derrames
Idiomas disponibles

Idiomas disponibles

SEPARATING SPILL CONTAINMENT
WORKSTATIONS BOUND BY CONNECTORS
1.
While lifting one workstation slightly off the ground,
gently tap on the top edge of the other attached
workstation with a plastic or rubber mallet.
(See Figure 5)
PAGE 2 OF 6
ASSEMBLY CONTINUED
2. After repeated taps, the workstations should
separate. (See Figure 6)
3. Repeat steps 1 and 2 to detach the other connectors.
Figure 5
1-800-295-5510
uline.com
NOTE: When separating accumulation centers
always remember to remove the grates and
make sure there is no liquid in the sump areas.
Figure 6
0321 IH-4039
loading