2.9 COMMISSIONING (FILLING THE BOILER)
The following operating procedure needs to be effected during the
installation phase:
1.
Turn on the power using the main switch I on the wall.
2. The following appears on the display
3. Press the line button
begin filling
4. Wait until the water comes out of the rinse arm nozzles I (boiler
filling is complete)
5. Turn off the power using the main switch on the wall
6.
Put deep-switch no. 4 in the "ON" position
7. Restore the machine power and it is ready for operation
This operation is required every time the boiler is emptied and
must be carried out
a) Check the level in the wash tank making sure that
when the solenoid valve closes the water is 1-2 cm
below the overflow level.
b) Check that the wash tank temperature is 55 - 60°C by looking at
the thermometer on the control panel.
Check that the boiler temperature is between 85 - 90°C by looking
at the thermometer on the control panel.
c) Check the working order of the automatic surface active agent
dispenser which will, however,
installs the machine
d) Check the working order of the rinse economiser. It must start to
distribute hot water rinse at system pressure when a rack arrives under
the jets and stop when the rack comes out.
It is recommended that the water in the boiler be cold for this
step.
the machine will
2.10
be started by the technician who
GB