84
AVENTICS | PROFIBUS DP | R412009414-BDL-001-AE
Commissioning/Operation
7.4
Commissioning the bus coupler
Before commissioning the system, the following steps must
have been carried out and completed:
W
You have assembled the valve terminals and the bus
coupler (see "Assembling the bus coupler
on the valve system" on page 62).
W
You have connected the bus coupler (see "Connecting the
bus coupler electrically" on page 63).
W
You have made presettings and configured the system (see
"Making presettings" on page 69 and "Bus coupler
configuration" on page 76).
W
You have configured the bus master so that it controls the
valves correctly.
Commissioning may only be carried out by qualified
electrical or pneumatic personnel or an instructed person
under the direction and supervision of qualified personnel
(see "Personnel qualifications" on page 51).
Uncontrolled actuator movements when the pneumatics are
switched on
Danger of injury if the system is in an undefined state and the
manual overrides are set to position "1".
O
Put the system in a defined state before switching it on.
O
Set all manual overrides to position "0".
O
Make sure that no personnel are within the hazardous
zone when the compressed air supply is switched on.
O
Also observe the applicable instructions and safety
information in the VS operating instructions.
1. Switch on the operating voltage.
2. Check the LED displays on all modules.
3. Switch on the compressed air supply.
CAUTION