ASSEMBLY INSTRUCTIONS
1. Place the vanity base (A) on top of the foam
packaging (supplied as cabinet wrap) with its top
facing downward. Place each leg (B) in the
corresponding hole on the bottom of the vanity
base (A). Align the legs (B) so the preset inserts
match the holes in the vanity base (A). Insert each
1-1/4 in. screw (AA) and tighten each with the
allen key (CC).
Hardware Used
AA
1-1/4 in. Screw
CC
Allen Key
2. Rotate the vanity base (A) so its top is now facing
upward. Insert each shelf support (EE) into the
predrilled holes in the vanity base (A) then insert
shelf (D).
Hardware Used
EE
Shelf Support
3. Using a level, locate any uneven floor and/or wall
areas where your vanity will be installed. Unevenness
can cause your vanity to become misaligned, resulting
in twisting of the cabinet. Repair any uneven areas
by reducing high spots or shimming low spots. Mark
the locations of the two M8 x 2 in. screws (not included)
on the wall, ensuring that they are level. It is
recommended that the vanity base (A) be installed to
at least 1 wall stud. In order to locate wall studs, you
can use a stud finder or tap along the wall until you find
a spot that sounds solid. If you are unable to locate a
wall stud, it is recommended that you use wall anchors
(not included) to secure the vanity base (A). Note: Studs
are usually located 16 in. apart from each other.
1
CC
x 8
x 1
2
A
x 4
3
A
4
a
A
d
c
B
a
b
AA
EE
B
b
c
d
D