All manuals and user guides at all-guides.com
17 DESCRIPTION OF THE INSTRUMENT
1
2
7
6
3
5
4
18 USING THE INSTRUMENT
18.1 DIRECTION OF PHASE ROTATION
On a three-phase electrical network:
1.
Connect the 3 leads to the instrument, matching the
markings.
2.
Connect the 3 alligator clips to the 3 phases of the network to
be tested.
3.
Press the ON button. The green indicator indicates that the
instrument is in operation.
4.
The clockwise (or anticlockwise) rotation indicator indicates
the direction of phase rotation.
English
1 Test lead input terminals
2 Indicators L1, L2, and L3
3 Green Clockwise rotation led
4 Red Anticlockwise rotation led
5 On/Off button
6 Green On led
7 Symbol for CA 6609 correct
orientation on the motor (§ 6)
19