NewAir NKR058MB00 Manual Del Propietário página 18

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Gas Line to Coupler Installation
1. Attach the other end of the gas line (blue) to the gas input on the keg
coupler.
2. Secure the line by tightening the steel hose clamp already attached to the
line. Use Pliers/screwdriver to tighten clamp and be sure to check for leaks
in this area once the CO2 is flowing out of the cylinder.
Beer Line Installation
1. Place a valve washer between the beer line output on the coupler and the
nut on the end of the beer line.
2. Tighten the nut at the beer line to the beer input on the keg coupler.
3. Secure the line by tightening the steel hose clamp. Use pliers/screwdriver
to tighten clamp and be sure to check for leaks in this area once the CO2 is
flowing out of the cylinder.
www.newair.com
EN
18
Tabla de contenido

Solución de problemas

loading

Tabla de contenido