Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

Pump station ST 20/11

1. Installation

1
2
1.1 Mounting of the solar station
Determine mounting place.
Unpack the whole solar station.
Take off the front insulation jacket of the solar station.
Have the solar group always screwed to the
backside of the insulation jacket!
Mark the bore holes through the insulation, drill with a
8 mm drill, put the enclosed dowels (S 8) into the bore
holes.
Fasten the complet solar group with the enclosed
screws (S6 x 60 mm) to the wall. Use therefor a posi-
tive cross recess screw-driver!
Establish the pipework between the solar group and
the store and collector respectively.
The following instructions have to be considered
urgently for connection of the pipes into the cutting
ring!
12
|
All manuals and user guides at all-guides.com
9
5
7
6
4
1
wall mounting
2
insulation - backside
8
3
insulation - forepart
4
flowmeter
5
flushing-cock (KFE-cock)
6
pump
7
ball valve with integrated non-
3
return valve
8
solar manometer 0 ... 6 bar
9
solar security valve 6 bar
All the connections are checked and tightened so that nor-
mally a retightening is not necessary. However by commissi-
oning of the system all the connections have to be checked
at tightness (pressure test).
Tabla de contenido
loading

Tabla de contenido