TUBESCA-COMABI NEOLIUM C 200 Manual De Usuario página 78

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 136
2-12. NEOLIUM LINE 200/250 and 300 12.00m platform assembly
• Closely follow the whole of chapter 2-10 to assemble the NEOLIUM 200/250 and 300 10m
platform.
• Assemble the 2 x 2.00m extensions by following § 2-1-5.
• Mount the platform with the hatch on rung no. 47 by following § 2-1-6.
• Mount the 4 braces on rungs no. 47, and then no. 49, by following § 2-1-7.
• Position the toeboards by following § 2-1-8.
106-A000035565 - ind.D - 11/2021
78
Tabla de contenido
loading

Tabla de contenido