Ceiling Recess - BROMIC PLATINUM SMART-HEAT Instalacion, Instrucciones Y Manual

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

HEATING INSTALLATION INSTRUCTIONS
CEILING RECESS (SOLD SEPARATELY)
!
WARNING
Instructions below are suitable for ceiling surfaces 10-
30mm thick. For ceiling surfaces
thicker than 30mm contact Bromic for alternative
installation options.
!
WARNING
The heater shall, under no circumstance, be covered with
insulating material or similar material.
During installation the supply cord should be positioned
such that it exits from the nearest edge of the heater
and not from the centre or across the heater
1. Prepare ceiling cut out. Heater must be installed with
heater surface at least 2400mm above the floor level.
2. Put ceiling support brackets in position.
3. From below, bring ceiling frame up and into ceiling cut
out.
4. Fasten ceiling frame to ceiling support brackets with
M5 screws & nyloc nuts. Which locator hole to use is
e for ceiling
dictated by thickness of ceiling surface.
eiling surfaces
omic for
s.
orated rear cover
must be kept clear
5. Screw hex spacers into 4 mounting holes. Spacers
must be assembled between heater & rear mounting
brackets.
6. Assemble rear mounting brackets to spacers with M5
screws.
ts in position
7. Raise one side of heater up into ceiling frame cavity &
rame up and into
then raise whole heater into cavity.
8. Rotate the heater into horizontal position in the ceiling
ition with M4x10
cavity & then lower down onto the ceiling frame.
cator hole to use
9. Ensure all four rear mounting brackets are hooked over
ing surface.
the ceiling frame & centre the heater inside the frame.
10. Make electrical connection from heater to power
supply.
rackets to heater
10
All manuals and user guides at all-guides.com
Minimum vertical ceiling space clearance measured from
ceiling surface must be 300mm.
Minimum horizontal ceiling space clearance measured
from each edge of ceiling cut out must be 500mm.
Minimum distance between heaters measured from edge
of ceiling cut out must be 500mm.
Joists, beams and rafters shall not be cut or notched to
install the heater.
www.bromicheating.com
CONTINUED...
!
WARNING
!
WARNING
1008
1
Ceiling Cut Out
3
2
4
6
5
Tabla de contenido
loading

Productos relacionados para BROMIC PLATINUM SMART-HEAT

Este manual también es adecuado para:

Bh0320001

Tabla de contenido