T&S B-0113 La Instalación Y Las Instrucciones De Mantenimiento página 5

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

General Instructions
Pre-Rinse Installation:
1. Shut off water supply and drain
lines.Apply Teflon tape or pipe joint
compound to threads on both ends of
no.24. Screw no.24 into no.1 and hand
tighten.
2. Slide no.25 down no.24 (about
halfway) and tighten temporarily.
25
24
3. Screw no.23 down on no.24 and hand
tighten, then tighten no.23 with a wrench,
which will also tighten no.24. Make sure
to align no.25 over center of sink, directly
in front of no.24 while tightening.
23
Note: If new no.22 is being installed on
no.21, make sure it's installed in the
upright position.
4. Adjust position of no.25 so that no.20
hangs loosely in it without straining
no.21 or no.22.
5. Turn on water supply and check for
leaks.
See back pages for similar unit
Caution: Turn off water supply at
base faucet when not in use.
24
5
22
21
20
25
installations.
Tabla de contenido
loading

Tabla de contenido