cycle will again be performed. The same applies if the water in the tank runs out during the
filling phase 15: when the tank is refilled, the machine will carry out another filling cycle for
90 seconds.
5. Now that the coffee/hot water boiler has been filled, the control unit will start the heating of
both the coffee/hot water boiler and the steam boiler. During the heating phase, the led
located under the tank will light up the water blue inside the tank, and all the buttons on the
pushbutton panel will flash.
HEATING
Each time the coffee machine is turned on or at the end of the initialisation cycle, the control
unit will enable the heating of the coffee/tea boiler and the steam boiler.
touch pushbutton panel. When the temperature is reached, the RGB led will change colour,
becoming WHITE, indicating that a supply cycle can be started and and the icons on the
TOUCH pushbutton panel will stop flashing.
PROGRAMMING OF AUTOMATIC COFFEE DOSE
1. Switch the main switch from OFF to ON and, without touching the pushbutton panel, wait
for the leds to light up. Carry out the following procedure within 10 seconds from the
moment the buttons light up.
2. Open the cover 11 (if the cover is already open, leave it open).
3. Hold down the automatic supply button 7
programming mode (the relative button will flash signalling that it entered the programming
mode, after which it can be released).
4. Insert an espresso coffee capsule in the compartment and close the cover 11 .
5. Press and release the automatic supply button 7
If the button is not pressed within 60 seconds, the coffee machine will exit the programming
mode and the dose programming cycle must be repeated, starting from the initial program-
ming point.
6. When the required amount of coffee has been obtained in the cup, press the automatic sup-
ply button 7
again to stop the supply and store, with that procedure, the duration of the
automatic dose supply.
USE
MAKING COFFEE
MAKING COFFEE IN MANUAL MODE
1. Lift cover 11 of the coffee supply unit and place a new coffee capsule 13 in the holder (figure 3).
2. Close the cover and place a cup beneath the coffee supply spout 12.
All manuals and user guides at all-guides.com
to start the dose programming cycle.
3
11
23