Installation; Installation Layout; Hydraulic Connection; Electrical Connection - poolstar POOLEX NANO ACTION 3kW Manual De Usuario Y Instalacion

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 93
3.2

Installation layout

POOL
The filter located upstream of the heat pump must be regularly cleared so that the water in the
system is clean, thus avoiding the operational problems associated with dirt or clogging in the
filter.
3.3

Hydraulic connection

Step 1
Screw the connectors to the heat pump
3.4

Electrical connection

The heat pump electrical plug integrates a 10mA
differential circuit breaker.
Before connecting your heat pump, please ensure
that the plug is connected to the ground.
The filter pump should function at the same time
as the heat pump. Therefore, you need to connect
them to the same electrical circuit.

3. Installation

TOWARDS THE POOL
Filtration + Pump
Step 2
Connect the water outlet pipe and the water
intake pipe
Automated treatment
system
FROM THE POOL
比例 1.000
EN | 13
Tabla de contenido
loading

Este manual también es adecuado para:

Poolex nano action 4kwPoolex nano action 5kw

Tabla de contenido