5
5
Insert Wall Support Beams (WSB) into walls as shown and mark
WP2
the location of the Wall Support Beams on the inteior of the shed
walls with a pen for reference.
Add the remaining WP2 panels to build the right side wall.
Ensure all parts are fully seated.
6
6
Complete the front walls by adding the Corner Posts (CN1), Front Wall
Panels (WP3) and Door Jambs (VDJ). Ensure all parts are fully seated.
Insert Wall Support Beams (WSB)
into walls as shown and mark
the location of the Wall Support
Beams on the interior of the shed
walls with a pen for reference.
WP2
WP2
WP2
WSB
VDJ
WP3
WP3
CN1
19
WP1
WSB
WP2
WP2
WP2
VDJ
WP3
WP3
CN1
WP1
WP1
WP1
WSB
WSB
WSB
CN1
WP2
WP2
WP2
WP2
WP2
WP2