Spout
Aerator
6. Complete the Installation
Install the finished floor and walls. Leave the marked area at the
base of the spout clear.
Install the spout and attach the standoff rod.
Attach the base of the spout to the exposed subfloor with the
provided screws.
Slide the base and standoff escutcheon into place.
Ensure that both faucet handles are turned off (hot = clockwise,
cold = counterclockwise).
Remove the aerator assembly.
Turn on the hot and cold valves and run water through the spout
to remove debris. Check for leaks.
Turn off the hot and cold valves.
Install the aerator.
Kohler Co.
9
1006092-2-B