Neolium 5.80M Platform Assembly - TUBESCA-COMABI NEOLIUM SX Instrucciones De Montaje Y De Uso

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 98
2-5 NEOLIUM SX 5.80m platform assembly
1. Repeat steps §2-1.1 to §2-1.3.
2. Assemble the 3 and 6-rung extensions by following §2-12.
3. Assemble the stabiliser extensions by following §2-3.1.
4. Mount the stabiliser extensions above rung no. 3 and below rung no. 9 by following §2-1.4.
5. Mount the support platform on rung no. 3.
6. Pre-mount the 2 cross braces and fasten them on rung no. 4 of the 2 x 6-rung extensions.
7. Mount the 2 extensions on the scaffolding and pin together with 4 x Ø10 tube-clip pins.
8. Fasten the 2 cross braces on rungs no. 8 by following diagram §2-1.3.
9. Mount the braces on rung no. 11, and the middle rails on rung no. 9, by following §2-1.6.
10. Remove the assembly support platform, then mount the platform on rung no. 7.
11. Put the toeboards into position.
12. Repeat steps nos. 6 -11 by: (no assembly support platform).
a. Fastening the cross braces on rungs no. 14.
b. Mounting the 4 braces on rungs no. 17 and no. 19 with the pole.
c. Mounting the platform on rung no. 15.
d. Putting the toeboards into position.
13. Repeat steps nos. 6 -11 by: (no assembly support platform).
a. Fastening the cross braces on rungs no. 20.
b. Mounting the 4 braces on rungs no. 25 and no. 27 with the pole.
c. Mounting the platform on rung no. 23.
d. Putting the toeboards into position.
1
3 & 4
Check the stabiliser spacing
by following §2-3.3.
102-02920515 - ind.C - 11/2021
2
5
59
Tabla de contenido
loading

Tabla de contenido