6. Assembly
•
Check that all parts, necessary tools and safety aids are present (e.g. helmet, gloves, safety shoes).
•
Required tools:
- Rope
- Spirit level
- Ring spanner
•
Assemble the components following the steps shown in appendix T4
•
Make all the connections as shown in Annex T3
•
See the table below for the reference to the annex with the configuration table and configurations per type of rolling tower
Configuration
RS TOWER 34
Configuration table and assemblies
Module 1 (0.75 m platform height) (T4.1 - 4.2)
1. Mount the wheels (part T2.E) and secure with locking pin [T3.1]
2. Open the folding frame (part T2.A), place the platform (part T2.F) on the 2nd rung and secure it [T3.3 - T3.4]
3. Point the wheels outwards, put the brakes on and adjust the base section using a spirit level through the hole pattern in the wheel post
4. Place the horizontal brace (part T2.G) on the upper rung opposite the folding frame [T3.5 - T3.6]
5. Mount the stabilizers (part T2.J) of module A at an angle of 45 degrees.
The scaffold is now ready for use.
Module 1+2 (1.8 m platform height) (T4.1 - 4.5)
1. Mount the wheels (part T2.E) and secure with locking pin [T3.1]
2. Open the folding frame (part T2.A), place the platform (part T2.F) on the 2nd rung and secure it [T3.3 - T3.4]
3. Place a horizontal brace (part T2.G) above the wheels [T3.5 - T3.6]
4. Point the wheels outwards, adjust the base section with a spirit level and put the wheels on the brake [T3.2]
5. Mount the collar tubes (part T2.D). Collar tubes must retain some play [T3.12 - T3.13]
6. Fit and secure the end supports (part T2.C) [T3.9 - T3.11]
7. Mount the large stabilizers (part T2.K) at an angle of 60 degrees [T3.14 - T3.18]
8. Move the platform (part T2.F) to the 6th rung of the folding frame (part T2.A) and secure it [T3.3 - T3.4]
9. Place a diagonal brace (part T2.H) from rung 1 to rung 5 [T3.7 - T3.8]
10. Sit in the platform hatch and position the double guardrail brace (part T2.I) on one side and the 2 horizontal braces (part T2.G) on the
other side from the inside to the outside [T3.5 - T3.6]
11. Mount the side board holders and side boards (part T2.L).
The scaffold is now ready for use.
Module 1+2+3 (3.8 m platform height) (T4.6 – T4.9)
1. Mount the wheels (part T2.E) and secure with locking pin [T3.1]
2. Open the folding frame (part T2.A), place the platform (part T2.F) on the 2nd rung and secure it [T3.3 - T3.4]
3. Place a horizontal brace (part T2.G) above the wheels [T3.5 - T3.6]
4. Point the wheels outwards, adjust the base section with a spirit level and put the wheels on the brake [T3.2]
5. Mount the collar tubes (part T2.D) on the folding frame. Collar tubes must retain some play [T3.12 - T3.13]
6. Mount the collar tubes (part T2.D) on the folding frame (part T2.B). Collar tubes must retain some play [T3.12 - T3.13]
7. Fit the end supports (part T2.B) and secure them [T3.9 - T3.11]
8. Mount the large stabilizers (part T2.K) at an angle of 60 degrees [T3.14 - T3.18]
9. Move the platform (part T2.F) to the 6th rung of the folding frame (part T2.A) and secure it [T3.3 - T3.4]
10. Place a diagonal brace (part T2.H) from rung 1 to rung 5 [T3.7 - T3.8]
11. Sit in the platform hatch and position the double guardrail braces (part T2.I) from the inside out [T3.5 - 3.6]
12. Stand on the platform and place the diagonal braces (part T2.H) from rung 8 to 11 [T3.7 – T3.8]
13. Fit and secure the end supports (part T2.C) [T3.9 - T3.11]
14. Place the platform (part T2.F) on rung 13 and secure it [T3.3 - T3.4]
15. Sit in the platform hatch and position the double guardrail brace (part T2.I) on one side and the 2 horizontal braces (part T2.G) on the
other side from the inside to the outside [T3.5 - T3.6]
16. Mount the side board holders and side boards (part T2.L).
The scaffold is now ready for use.