Important! The fitting must be installed, flushed
and tested after the valid norms!
Plaster in the installed and checked stop valve, in
case of pre-wall installation cover it with a panel .
After the plastered wall surface is dry seal the
gap with silicone (free from acetic acid!) between
wall and plastic housing of the ibox.
Apply PCI-Lastogum or similar sealing
compound on the wall in accordance with
manufacturers indications.
Put gasket over the plastic sleeve of the Quattro
four-way-diverter.
Important! The gasket is not suitable for hot
glue. If the flush valve shall be secured with hot-
melted adhesive, it must be ensured that it is not
damaged.
5
Hansgrohe · Postfach 1145 · D-77761 Schiltach · Telefon +49 (0) 78 36/51-1282 · Telefax +49 (0) 7836/511440