Devon & Devon Duke Instrucciones De Montaje página 15

Tabla de contenido
Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 34
8)
Remove the structure and
drill the 4 holes as marked.
Insert the rawl plugs which are not
supplied in the holes, position the
structure again and fasten it using
screws which are not supplied.
10)
Rest the Etoile basin on the structure, finding a good
compromise between resting on the structure and leaning against
the wall.
If necessary, work on the adjustable supports using the screwdriver.
9)
Position the covers at the
corners of the structure in
correspondence with the legs.
16
Tabla de contenido
loading

Tabla de contenido