Outdoor Unit Installation Drawings - Daikin RXTM30N2V1B Manual De Instalación

Ocultar thumbs Ver también para RXTM30N2V1B:
Tabla de contenido

Outdoor Unit Installation Drawings

Max. allowable piping length
Min. allowable piping length
**
Max. allowable piping height
Additional refrigerant
*
required for refrigerant pipe
exceeding 10m in length.
Gas pipe
Liquid pipe
*
Be sure to add the proper amount of additional refrigerant.
Failure to do so may result in reduced performance.
**
The suggested shortest pipe length is 1.5m, in order to avoid
noise from the outdoor unit and vibration.
(Mechanical noise and vibration may occur depending on how
the unit is installed and the environment in which it is used.)
In sites with poor drainage, use
block bases for outdoor unit.
Adjust foot height until the unit
is leveled. Otherwise, water
leakage or pooling of water may
occur.
English
20m
1.5m
15m
20g/m
O.D. 9.5mm
O.D. 6.4mm
Allow 300mm of
work space below
the ceilling surface
Where there is a danger of the unit
falling, use foot bolts, or wires.
unit: mm
Wrap the insulation pipe with
the finishing tape from bottom
to top.
CAUTION
**Set the piping length
from 1.5m to 20m.
Allow space for piping
and electrical servicing.
Stop valve cover
How to remove the stop
valve cover
Remove the screw on the
stop valve cover.
Slide the cover downward
to remove it.
How to attach the stop
valve cover
Insert the upper part of
the stop valve cover into the
outdoor unit.
Tighten the screws.
4
Tabla de contenido
loading

Este manual también es adecuado para:

Rxtm40n2v1bRxtp25n2v1bRxtp35n2v1bArxtp25n2v1bArxtp35n2v1b

Tabla de contenido