Fold Down Procedure; Erection Procedure - Upright XRT27E Electric Manual Del Operador

Tabla de contenido
Idiomas disponibles

Idiomas disponibles

Before operating the machine, guardrails must be securely fastened in their
proper position.
XRT Electric
F
D
G
OLD
OWN
UARDRAILS
NOTE: When performing the following procedures, retain all fasteners.
This procedure is only for passing through doorways. Guardrails must be returned to proper posi-
tion before using the machine.
F
D
P
OLD
OWN
ROCEDURE
1. Ensure that the slide-out deck extension is
fully retracted and deck pin is locked. Place
the Platform Controls on the platform.
2. Pull the pins on the two end gate arms.
Lower the rear gate to the floor. Replace the
pins.
3. Pull the two pins on the left side of the front
rail and swing the front rail back against the
right handrail. Insert pins into the right
handrail.
4. Lift the right handrail up, then lower it to the
extension deck floor.
5. Push the deck extension handle into locked
position. Lift the left handrail up, then lower
it on top of the right handrail.
6. Rotate the arms in against the handrails.
7. Lift the right main handrail and lower it to
the floor.
8. Lift the left main handrail and lower it on top
of the right main hand rail.
E
P
RECTION
ROCEDURE
1. Reverse the fold down procedure.
2. Hang the Platform Controls from front guardrail.
3. Before operating the work platform, check that all fasteners are in place and securely fas-
tened.
W A R N I N G
!
• Rear bar may be raised to load material. Material may not be longer than the platform.
• Be sure gate is closed and bar is lowered before operating the machine.
Figure 7: Fold Down Guardrails
!
Deck
Extension
Handle
9